Missoula Electric Cooperative (MEC) does allow the use and installation of GenerLink™ transfer switches (on Member-owned meter bases) for members who wish to connect a portable generator to their home during a power outage.

A GenerLink transfer switch is a meter-mounted device that allows a portable generator to safely supply power to a home without backfeeding electricity onto MEC’s system.

How the GenerLink Installation Process Works

MEC does not sell or install GenerLink units. However, we will facilitate the installation by safely handling our electric meter.

Step 1: Purchase a GenerLink
Members are responsible for selecting and purchasing the correct GenerLink model compatible with their electrical service and generator.

Step 2: Schedule Meter Removal
Once you have received your GenerLink, complete the form below to request a serviceman to temporarily remove your electric meter.

Request Scheduling

Step 3: Install the GenerLink
After the meter has been removed by MEC, the GenerLink may be installed by the member or a licensed electrician, following the manufacturer’s instructions and all applicable codes.

Important:

  • GenerLink transfer switches may only be installed on member-owned meter bases. Installation on MEC-owned meter bases, poles, pedestals, or any other MEC-owned equipment is prohibited. Members are responsible for confirming ownership of the meter base prior to installation.
  • If installation of the GenerLink would cause MEC’s meter to extend beyond the protection of an existing roof eave or overhang, the member must provide suitable protection from snow, ice, or other falling debris acceptable to MEC before installation will be allowed to proceed.

Step 4: Meter Reinstallation
Once installation is complete, MEC will:

  • Reinstall the electric meter

  • Install the required meter rings and seals

⚠️ Important: Only MEC employees are authorized to remove or reinstall MEC electric meters.

Member Responsibilities

Members using a GenerLink and portable generator are responsible for:

  • Proper selection, installation, and use of the GenerLink transfer switch

  • Managing electrical load to avoid overloading the generator

  • Monitoring voltage levels while operating on generator power

  • Any damage to appliances or equipment caused by improper generator use, low-voltage conditions, or overload situations

  • Ensuring compliance with all local, state, and national electrical codes

  • Providing and maintaining sufficient protection for MEC’s meter in the event the GenerLink causes the meter to become vulnerable to falling ice and snow.

Safety, Liability, and Legal Notice

Missoula Electric Cooperative does not sell, endorse, certify, or warranty GenerLink products or portable generators, nor their operation during power outages.

MEC shall not be liable for any damages, losses, or injuries arising from:

  • The installation or use of a GenerLink transfer switch
  • The operation of a portable generator
  • Improper load management or low-voltage conditions
  • Equipment failure or electrical damage on the member’s premises
  • Service interruptions, property damage, personal injury, or equipment failures associated with the installation, operation, maintenance, repair, removal, replacement, or failure of a GenerLink device
  • Damage to generators, electrical systems, residences, appliances, vehicles, structures, or other property associated with use of a GenerLink system

The member assumes all responsibility and risk associated with the purchase, installation, and operation of a GenerLink transfer switch and portable generator.

Meter Tampering Policy

Only authorized Missoula Electric Cooperative employees may remove or install MEC electric meters.

Any member who removes, or causes a meter to be removed, without MEC authorization and employee assistance will be subject to MEC’s policies and procedures regarding meter tampering, which may include fees, service disconnection, or other corrective actions.

Request Scheduling

To schedule meter removal or if you have questions about using a GenerLink transfer switch, please use the following form:

SERVICE REQUEST GENERLINK™ TRANSFER SWITCH

SERVICE REQUEST GENERLINK™ TRANSFER SWITCH

Enter your account number to assist our staff with creating a service order
Enter the meter number for the service where the switch will be installed
Enter the physical address where the electrical service is located
Enter the best phone number to reach with for scheduling or if we have questions
I request that MEC temporarily remove and reinstall the electric meter serving the above location to facilitate installation of a GenerLink™ transfer switch. I understand that only authorized MEC personnel may remove and reinstall MEC-owned electric meters, meter rings, and seals.

INSTALLATION REQUIREMENTS

Missoula Electric Cooperative (“MEC”) may allow the installation of a GenerLink™ transfer switch (“Switch”) between a Member-owned meter base and MEC’s electric meter, subject to MEC approval and the terms of this Agreement. The Member acknowledges and agrees to the following:

1. The Member is responsible for obtaining the Switch before submitting this request. Requests are processed on a first come, first serve basis. Member is responsible for prepping the Switch for installation (Switch comes from the factory with a pigtail attached at the back which is to be wired into the neutral bus of the meter base. Member is responsible for splicing extra wire onto the pigtail to reach the bus. MEC and it’s employees are not authorized to extend the pigtail or wire it into the neutral bus. MEC strongly encourages Member to hire a licensed electrician to install Switch.

2. The Switch may only be installed on a Member-owned meter base. Installation on MEC-owned meter bases, poles, pedestals, or any other MEC-owned equipment is prohibited.

3. MEC does not perform any installation activities with respect to the Switch. MEC’s involvement is limited to removing and reinstalling its electric meter to facilitate Switch installation by a qualified installer.

4. Meter removal and reinstallation must be scheduled in advance with MEC. While this service is generally provided at no charge, MEC reserves the right to charge a trip fee if MEC personnel arrive and the installation is not ready to proceed, is incomplete, or requires additional visits.

5. Only MEC personnel may remove, reinstall, seal, or otherwise handle MEC-owned metering equipment. Unauthorized removal, tampering, or interference with MEC’s meter or metering equipment may result in tampering charges, service disconnection, replacement costs, and other applicable fees.

6. If installation of the Switch will cause MEC’s meter to extend beyond the protection of an existing roof eave or overhang, the Member must provide suitable protection from snow, ice, or other falling debris acceptable to MEC before MEC will allow installation to proceed.

7. The Member is responsible for obtaining any required permits, inspections, approvals, and for ensuring the installation complies with all applicable electrical codes and manufacturer requirements.

LIABILITY, DAMAGE, AND INDEMNIFICATION

1. The Member understands that MEC does not manufacture, sell, install, inspect, certify, maintain, monitor, or warrant the Switch or any associated equipment.

2. The Member assumes all responsibility and risk associated with the purchase, installation, operation, maintenance, repair, or failure of the Switch and any related electrical equipment.

3. MEC shall not be liable for any damages, losses, claims, injuries, service interruptions, equipment failures, property damage, or other costs arising from or related to the Switch, its installation, operation, removal, replacement, or failure. This release includes, but is not limited to, damage to the Switch, the Member’s generator, electrical system, home, appliances, equipment, vehicles, structures, property, or MEC’s meter.

4. The Member agrees to reimburse MEC for any damage to MEC-owned facilities, meters, metering equipment, seals, conductors, or other Cooperative property resulting from the installation, existence, operation, maintenance, failure, or removal of the Switch.

5. The Member further agrees to defend, indemnify, and hold harmless MEC, its directors, trustees, officers, employees, and agents from any claims, liabilities, damages, losses, costs, or expenses, including reasonable attorney fees, arising from or related to the installation or use of the Switch.

6. MEC reserves the right to deny any installation request, require modifications to protect MEC equipment, refuse meter reinstallation where unsafe conditions exist, or disconnect service when MEC determines such action is necessary to protect public safety, Cooperative facilities, or system reliability.

Download the Form